Compliance guide

Pressure systems and the written scheme of examination: what PSSR requires

If you run a steam boiler, an air receiver or a compressed air system, one document decides your whole examination programme: the written scheme of examination. This guide shows which equipment needs one, who must hold it and what it has to say.

Last checked against the sources below on . General guidance, not legal advice.

Is it a pressure system?

Regulation 2 of PSSR defines a pressure system as one of three things that contains, or is liable to contain, a relevant fluid:

  1. a system made up of one or more rigid pressure vessels, with any associated pipework and protective devices;
  2. the pipework and protective devices that a pressure receptacle (a gas cylinder, for example) is, or is meant to be, connected to;
  3. a pipeline and its protective devices.

The regulations apply to pressure systems used or intended to be used at work, subject to the exceptions in Schedule 1. HSE counts 25 complete exceptions and 3 partial ones, including weapons systems and vehicle tyres. Protective devices are devices designed to protect the system against failure or to warn that failure might occur, and they include bursting discs. They are part of the system.

What counts as a relevant fluid

Relevant fluids under regulation 2
FluidThe test
SteamAt any pressure (HSE).
Gas or gas mixture, including compressed airAt a pressure greater than 0.5 bar above atmospheric pressure.
Liquid or liquid mixtureOne that would have a vapour pressure greater than 0.5 bar above atmospheric pressure at its actual temperature or at 17.5 degrees Celsius. HSE gives pressurised hot water above 110 degrees Celsius as an example.
Dissolved gasA gas dissolved under pressure in a solvent held in a porous substance at ambient temperature, which could be released without heat. Acetylene is the usual case.

Common equipment, in scope or not

Use the table as a first pass. Edge cases, such as refrigeration plant, depend on the fluid and the pressure, so check the definition or ask a competent person.

Is it a pressure system? Common equipment
EquipmentPSSR applies?Why
Steam boilerYesIt holds steam, which is a relevant fluid at any pressure.
Steam steriliser or autoclaveYesSteam again. A pressure vessel with its pipework and protective devices is a pressure system.
Air receiverNormally yesCompressed air above 0.5 bar over atmospheric pressure is a relevant fluid.
Compressed air pipework and safety valvesYes, as part of the systemAssociated pipework and protective devices belong to the pressure system they serve.
Portable compressor with a receiverNormally yesA mobile system. The owner holds the duties.
Hydraulic circuitNoHydraulic oils are not relevant fluids (HSE).
Gas cylinder itselfNoPressure receptacles are excluded from the definition. The connected pipework may be covered.
Vehicle tyreNoListed in the exceptions in Schedule 1 (HSE).
Refrigeration or air conditioning plantDependsOn the refrigerant and the pressure. Check against the relevant fluid tests.

Who has which duty

Most of the duties land on the user of an installed system, meaning the employer or self-employed person who has control of its operation, and on the owner of a mobile system. A competent person has separate responsibilities.

The user's duties under PSSR
RegulationThe duty
7Establish the safe operating limits of the system before operating it.
8Have a written scheme for the periodic examination of the system, drawn up or certified suitable by a competent person, before operating it.
9Make sure the parts in the scheme are examined within its intervals, and do not operate past the dates in the examination report.
11Give the people who operate the system adequate and suitable instructions for safe operation and for emergencies.
12Keep the system properly maintained in good repair so as to prevent danger.
14Keep the last examination report, earlier reports where they help assess whether the system is safe, the instructions supplied with the equipment where the regulation requires them, and any agreement to postpone an examination.

On hired or leased equipment, HSE says the user should make sure the written scheme is in place and the examination certificate is current. Schedule 2 lets duties move between supplier and user by arrangement.

What the written scheme must say

Regulation 8 sets out what the scheme covers and what it has to specify. The scheme is reviewed by a competent person at appropriate intervals, and changed in line with their recommendations.

Contents of a written scheme of examination (regulation 8)
The scheme mustDetail
Identify the parts coveredAll protective devices, every pressure vessel and pipeline where a defect may give rise to danger, and the parts of the pipework where a defect may give rise to danger.
Specify the nature and frequency of examinationWhat is examined, how, and how often.
Specify preparation for a safe examinationMeasures beyond those the user or owner could reasonably take without specialist advice.
Provide for a first-use examinationWhere appropriate, an examination before the system is used for the first time.
Be suitableSuitable for preventing danger from the parts it includes.

What an examination and report involve

PSSR defines an examination as a careful and critical scrutiny of the system, in or out of service as appropriate, using suitable techniques including testing where appropriate. It assesses the actual condition of the system and whether, up to the next examination, it will not cause danger when properly used and normally maintained.

After the examination the competent person makes a written report, signs and dates it, and sends it to the user or owner so that it arrives within 28 days of completion, or before the date given in the report if that is sooner. The report must:

  • state which parts were examined, their condition and the results;
  • specify any repairs, modifications or changes to the safe operating limits needed to prevent danger, with the date by which they must be done;
  • give the date, within the limits of the scheme, after which the system must not be operated without a further examination;
  • say whether the scheme is suitable or needs to change, and why.

If the competent person thinks the system will give rise to imminent danger unless repairs, modifications or changes to the operating conditions are made, regulation 10 applies. They must report that to you at once, send the enforcing authority a report with the same particulars within 14 days of the examination, and you must not operate the system, or the affected part, until the work is done.

How Fox Engineering Safety approaches it

Every examination we carry out follows the scope in your written scheme of examination. If you do not have one in place, we prepare one before the examination begins. Our competent persons then carry out a thorough examination, checking vessels, pipework, safety valves and associated protective devices, and issue a written report that details any defects found and the timescales for dealing with them.

The process runs from identifying your pressure equipment, through review of any existing scheme, in-service and out-of-service examination and testing (including non-destructive testing where deeper investigation is needed), to defect reporting and the compliance documentation. The equipment we cover is on our PSSR Inspection | Pressure Systems Safety Regulations 2000 page. To place PSSR next to LOLER and PUWER, read which statutory inspection do you need.

Sources

Duties, intervals and definitions on this page come from the legislation and HSE guidance listed here. Read the original when you need the exact wording.

Common questions

Questions people ask

What is a written scheme of examination?

A written document, drawn up or certified as suitable by a competent person, that identifies the parts of a pressure system that must be examined, and says what examination is needed and how often. The user of an installed system, or the owner of a mobile system, must have one before operating the system.

Does my air compressor need a written scheme?

Usually, if it feeds an air receiver or pipework holding compressed air above 0.5 bar over atmospheric pressure, because that makes the receiver and pipework a pressure system. A portable compressor moved between sites is a mobile system, so its owner carries the duty. HSE says a written scheme must be in place, and an examination made, before any qualifying pressure equipment is used. Schedule 1 of PSSR lists the exceptions, and HSE's approved code of practice L122 helps you decide.

How often must pressure equipment be examined?

PSSR sets no single interval. The written scheme must specify the nature and frequency of examination, and the user or owner must make sure the examination happens within the intervals in the scheme. The report says the date after which the system must not be operated without a further examination.

Who can write a written scheme?

A competent person must draw it up, or certify that it is suitable. The regulations also require a competent person to review its content at appropriate intervals and to change it as their recommendations require. HSE says an in-house competent person must be independent of the operating side of the organisation and have enough authority to stop the use of equipment.

What if I hire or lease the equipment?

The user of hired or leased equipment should make sure that the written scheme is in place and the examination certificate is current. Schedule 2 of PSSR allows the duties to move between supplier and user under a lease or hire arrangement, and HSE notes a supplier of an installed system can take on responsibility for the scheme in writing.

Is a gas cylinder a pressure system?

The definition of a pressure system excludes pressure receptacles such as gas cylinders. The pipework with its protective devices that a cylinder is, or is meant to be, connected to is covered if it contains a relevant fluid. Other regulations deal with transportable cylinders.